Job Order Contracting

Job Order Contracting (JOC) is a way for organizations to get numerous projects done quickly and easily through multi-year contracts. JOC provides the methodology to execute simultaneous orders for renovation, rehabilitation and repair work for large facilities and infrastructures. The JOC contractor provides “on call” construction services from concept to close-out. These contractors provide a variety of consultant services to prime construction contractors.

Please see the associated links within the table for more information.

2010-2011 Job Order Contractor (JOC) Opportunities

  1. PHX ADA Transition Plan Improvements (JOC)
  2. PHX Landside Pavement Maintenance (JOC)
  3. Phoenix Trash Bunker & Materials Yard Relocation (JOC)
  4. PHX Terminal 4 Interior Remodel (JOC)
  5. Washington Building Remodel (JOC)
  6. Job Order Contracting (JOC) Procurement
  7. Sound Insulation Mitigation Services (JOC) FAA
PHX ADA Transition Plan Improvements (JOC)

Remove or replace all remaining ADA barriers as identified on the transition plan provided by the Equal Opportunity Department, from all airport facilities that the public utilizes; multi-phase project.

JOC Prime(s):
Sun Eagle (Design) and CSW Construction (Civil and Landside)

Sub Contractor Bid Date:
On-going

Subcontracting Opportunities:
Contact Sun Eagle and CSW Construction

Last Updated 10/20/09

PHX Landside Pavement Maintenance (JOC)

Repairs of SHIA pavement. These will vary in complexity depending on the condition of the pavement and may take the form of removal and replacement, mill and overlay, applying some form of surface sealant to preserve the asphalt properties or a combination thereof.

JOC Prime:
CSW Construction

Project Hand-off for Cost Proposal:
Fall 2009

Subcontracting Opportunities:
Contact CSW Construction

Last Updated 10/20/09

Phoenix Trash Bunker & Materials Yard Relocation (JOC)

Determine site for long-term (8 to 10 years) waste handling site. Design and construct site with stationary compactor equipment. Assume purchase of equipment. Utility extensions requires APS allowance, stationary compactor with roll-off containers, lighting and electrical outlets, water, pressure washers, drainage and sanitary sewer connections.

JOC Prime:
CSW Construction

Project Hand-off for Cost Proposal:
Fall 2009

Subcontracting Opportunities:
Contact CSW Construction

Last Updated 10/20/09

PHX Terminal 4 Interior Remodel (JOC)

Request a reallocation of funds to replace worn areas of carpet and walk-off mats that are currently unsightly and could become a trip hazard.

JOC Prime:
CSW Construction

Project Hand-off for Cost Proposal:
Fall 2009

Subcontracting Opportunities:
Contact CSW Construction

Last Updated 02/18/10

Washington Building Remodel (JOC)

Scope includes the build-out of two restrooms, the addition of one office and a corridor system.

JOC Prime:
Sun Eagle

Project Hand-off for Cost Proposal:
Spring 2010

Subcontracting Opportunities:
Contact Sun Eagle

Last Updated 02/18/10

Job Order Contracting (JOC) Procurement

The City of Phoenix is seeking qualified Job Order Contractors to do business with the City of Phoenix on an “on-call” basis. At a minimum, the Aviation Civil Contractor will be performing construction/replacement services that may include but is not limited to: minor design work, earthwork and dust stabilization, concrete paving, pavement rehabilitation, landscape, electrical work, ADA retrofits, grading and drainage and underground utilities work.

Advertising:
April 5, 2010

JOC Prime:
Information Forthcoming

Procurement:
Summer 2010

Subcontracting Opportunities:
Information Forthcoming

Last Updated 03/30/10

Sound Insulation Mitigation Services (JOC) FAA

The City of Phoenix is seeking qualified Job Order Contractors to do business with the City of Phoenix on an “on-call” basis. This Job Order Contract (JOC) will provide general non-residential remodeling and repair construction services.

The Phoenix Sky Harbor International Airport’s Sound Insulation Mitigation Services provides voluntary sound mitigation services to property owners of non-residential structures. Sound mitigation services requires the addition or replacement of building materials to the envelope of a structure to ensure the necessary Noise Level Reduction between the exterior and the interior is achieved. These alterations to the structure typically include, but are not limited to, sound transmission class rated doors and windows, building insulation, new ceilings, HVAC upgrades or replacements, electrical upgrades and lead based paint and asbestos abatement. This is a Federal-aid project.

Advertising:
Spring 2010

JOC Prime:
Information Forthcoming

Procurement:
Summer 2010

Subcontracting Opportunities:
Information Forthcoming

Last Updated 03/30/10